Installation of new forcemain across the Kettle River
Year
2022
Method
Pipe Size
HDD
12" HDPE 30" Steel Conductor
Total Length
200 Meters 25 Meters
Installation of 2 new water intakes into Kamloops Lake
18" HDPE 30" Steel Conductors
70 Meters x 2 25 Meters x 2
HDD across Policeman's Creek, Guided Bore across CP Rail and Hwy 1A
2021
Combination
12" HDPE 30" Steel
90 Meters 101 Meters
Three drill shots through sandstone, crossing Hwy 1A and multiple pipelines
2020
4" Flexsteel 1.5" HDPE
30" Conductor
805 Meters 805 Meters
47 Meters
Three drill shots through rock into the ocean floor for subsea cables
2019
4" HDPE
110 Meters
Extremely steep grade +/- 65%; Close proximity to Skaha Lake
12" HDPE
150 Meters
Two casing installations across the Sea to Sky Highway
Pipe Ramming
24" Steel
96 Meters
Maintained 1% grade within ponding tolerance
10" HDPE
315 Meters
Four Auger Bore Crossings of 48" and 24" Steel Casings
Guided Auger Bore
48" & 24" Steel
180 Meters