RECENT PROJECTS

20220620_074632.heic

Kettle River Crossing, Grand Forks, BC

Installation of new forcemain across the Kettle River

Year

2022

Method

Pipe Size

HDD

12" HDPE        30" Steel Conductor

Total Length

200 Meters       25 Meters 

DJI_0533.JPG

New Gold Mine Lake Pump Station, Kamloops, BC

Installation of 2 new water intakes into Kamloops Lake

Year

2022

Method

Pipe Size

HDD

18" HDPE        30" Steel Conductors

Total Length

70 Meters x 2      25 Meters x 2

Canmore 1.jpg

South Bow River Loop Water Main, Canmore, AB

HDD across Policeman's Creek, Guided Bore across CP Rail and Hwy 1A

Year

2021

Method

Pipe Size

Combination

12" HDPE        30" Steel

Total Length

90 Meters      101 Meters

Cochrane 3.jpg

IPL Waterline Replacement, Cochrane, AB

Three drill shots through sandstone, crossing Hwy 1A and multiple pipelines

Year

2020

Method

Pipe Size

HDD

4" Flexsteel        1.5" HDPE

30" Conductor

Total Length

805 Meters      805 Meters

47 Meters

DJI_0032.JPG

Subsea Cables, Saturna Island, BC

Three drill shots through rock into the ocean floor for subsea cables

Year

2019

Method

Pipe Size

HDD

4" HDPE

Total Length

110 Meters

VWJC7905.JPG

Pineview Estates, Kaleden, BC

Extremely steep grade +/- 65%; Close proximity to Skaha Lake

Year

2019

Method

Pipe Size

HDD

12" HDPE

Total Length

150 Meters

Squamish.jpg

Squamish, BC

Two casing installations across the Sea to Sky Highway

Year

2019

Method

Pipe Size

Pipe Ramming

24" Steel

Total Length

96 Meters

Rig Set-up #2.jpg

Rega Properties, Nanaimo, BC

Maintained 1% grade within ponding tolerance

Year

2019

Method

Pipe Size

HDD

10" HDPE

Total Length

315 Meters

IMG_2717.JPG

YVR Core Project, Vancouver Airport, BC

Four Auger Bore Crossings of 48" and 24" Steel Casings

Year

2019

Method

Pipe Size

Guided Auger Bore

48" & 24" Steel

Total Length

180 Meters

bottom of page